Thought it was about time for another house update.  Man alive, the construction on this house is flying!  Every time Casey and I go out there, we are blown away by how much has been completed.  The outside is now completely finished with brick and rock.
Brick and Rock is complete!
They have also completed all the walls and have sprayed them with texture and painted them.
Walls are up
Paint Color
All the cabinets, doors, and trim have been installed as well as the banister on the stairs.
Kitchen Cabinets
Kitchen cabinets from living room
Stair banister (wood still needs to be stained)
And this week, they installed the fireplace and granite.
Fireplace
Kitchen Granite
Master Bathroom
When we went out yesterday to check on the progress, all the tile had been delivered so I assume they will start tiling the bathrooms and back splash soon.  They still have to put in all the hard wood and carpet, install light fixtures, install the sinks, pour the driveway and lay the sod.  Our builder has told us that we should close sometime in October, we are just waiting to hear a final closing date right now.  It can't come soon enough!  We are so excited to move into this house!  It already feels so much like home.